Your reliable partner
Installation notice
1、Prepare the three-phase 380V power supply,20KVA and ground wire.
2、Compressed air: p=6kgf/cm2、Q=5m3/h, air connector: 1/2″gas thread.
3、Prepare enough space for the machine placement working and maintenance.